Skip to primary content

Greatest Boom Ever

EMPOWERING INVESTORS WORLDWIDE

Greatest Boom Ever

Main menu

  • Latest News
  • About Us
  • Alberta Economics
  • Current Commentary
    • Alberta Commentary 2014
    • Alberta Commentary 2013
    • Alberta Commentary 2012
  • Mortgage Tools
    • Complete Mortgage Calculator
    • Quick Calc
  • Connect

Post navigation

← Previous Next →

Berm system could cost $22M

Posted on July 27, 2013 by Joe

The cost of a berm system throughout Medicine Hat to hold back a flood of 1995 proportions could cost at least $22 million to build today, based on an engineering study done after record flooding that year, sources told the News this week.

Read more: http://tinyurl.com/m4n5oag

This entry was posted in Medicine Hat (Alberta) and tagged floods, mitigation by Joe. Bookmark the permalink.
Proudly powered by WordPress