Municipality begins building temporary flood berms to prepare for 2021 river breakup

The municipality is building temporary flood berms in downtown and Waterways to prepare for river breakup in 2021. These temporary measures include a combination of sandbags and clay berms, and work is scheduled to be finished by Dec. 31. Temporary berms have already been built alongside Taiga Nova Industrial Park.

Read more: https://bit.ly/3kH9Tkr