Pumping of Cochrane Lake to the Bow River is slated to be fully operational by Aug. 28, as the province works to bring the flooded lake back down to 1,281 meters (or close to it) before winter arrives.
Read more: http://tinyurl.com/nqbwhl8
Pumping of Cochrane Lake to the Bow River is slated to be fully operational by Aug. 28, as the province works to bring the flooded lake back down to 1,281 meters (or close to it) before winter arrives.
Read more: http://tinyurl.com/nqbwhl8