Skip to primary content

Greatest Boom Ever

EMPOWERING INVESTORS WORLDWIDE

Greatest Boom Ever

Main menu

  • Latest News
  • About Us
  • Alberta Economics
  • Current Commentary
    • Alberta Commentary 2014
    • Alberta Commentary 2013
    • Alberta Commentary 2012
  • Mortgage Tools
    • Complete Mortgage Calculator
    • Quick Calc
  • Connect

Post navigation

← Previous Next →

Massive power plant turbine arrives

Posted on January 6, 2017 by Joe

Two major components of the new north-end power-plant arrived by special delivery Thursday in Medicine Hat — about a month after the General Electric turbine left a production facility in Texas.

Read more: http://tinyurl.com/zew9szg

This entry was posted in Medicine Hat (Alberta) by Joe. Bookmark the permalink.
Proudly powered by WordPress